• Debian 11 is approaching its end-of-life (vendor EOL date - August 31, 2026). Plesk Obsidian 18.0.80 will be the last release to support it.
    If you are running Plesk Obsidian on Debian 11, we recommend you upgrade those servers to Debian 12 using our dist-upgrade tool.
  • We plan to deprecate and remove the support for XML RPC protocol versions earlier than 1.6.9.1 in Plesk Obsidian 18.0.82. We strongly recommend that you update all existing integrations using earlier versions of the XML RPC protocol to comply with the version 1.6.9.1 specification.

Database psa.BackupsScheduled issue

R

RaphaelR

Guest
Hello community,

My plateform is 9.2.1 and 8.3

I read the KB "http://kb.odin.com/en/6194", but I want to know if I can modify the field "last" to solve my date backup issue.

Obviously my 9.2.1 plateform doesn't integrate the fix who's describe in the KB

Thanks in advance.

Raf
 
What do you mean? What is the problem there? Could you please be more specific?
 
Thanks,

In fact, i can't reconfigured the date of the scheduled backup. via the PPP I select weekly backup I specify the day e.g Saturday, but the backup doesn't run the specified day. I check my psa database and effectively the field last in BackupScheduled table doesn't change.
My backup run on the previous scheduled backup.

An idea

Thanks
 
Back
Top