Greetings,
Need to determine the best method to migrate server setups, domains, databases and the whole shootin match from a Plesk 8.6 box to another Plesk 8.6 box - both on Fedora 8. Now the trick is that the first box is a virtual setup under Virtuozzo, the other is back to a dedicated box (thankfully) with straight up Plesk 8.6. I notice some differences already in the options I have on the open new copy vs. the restricted Virtuozzo I'm moving from.
The migration tool obviously doesn't seem to understand moving things from another server, just from other servers with other OS's or older Plesk on them. It may, but the help docs don't really explain that very well if that's the case.
Anyone know a smooth way to transition my existing stuff and client's data from the old 'mess' at my former HSP to the new dedicated box without losing a ton or having to manually snag and drop every last little bit? Even if I'm just manually migrating certain elements I can live with that. But I've got about 15 days to fully accomplish this before the old virtual slice takes a permanent hike. Yes, fully aware of 'services' who do this stuff but that's not what I'm after because it should be something we can perform locally without that much of a hassle with the right clues.
Open to checklists of things to be watched for, not missed, possible problems and the like as well!
Thanks,
Dave
Need to determine the best method to migrate server setups, domains, databases and the whole shootin match from a Plesk 8.6 box to another Plesk 8.6 box - both on Fedora 8. Now the trick is that the first box is a virtual setup under Virtuozzo, the other is back to a dedicated box (thankfully) with straight up Plesk 8.6. I notice some differences already in the options I have on the open new copy vs. the restricted Virtuozzo I'm moving from.
The migration tool obviously doesn't seem to understand moving things from another server, just from other servers with other OS's or older Plesk on them. It may, but the help docs don't really explain that very well if that's the case.
Anyone know a smooth way to transition my existing stuff and client's data from the old 'mess' at my former HSP to the new dedicated box without losing a ton or having to manually snag and drop every last little bit? Even if I'm just manually migrating certain elements I can live with that. But I've got about 15 days to fully accomplish this before the old virtual slice takes a permanent hike. Yes, fully aware of 'services' who do this stuff but that's not what I'm after because it should be something we can perform locally without that much of a hassle with the right clues.
Open to checklists of things to be watched for, not missed, possible problems and the like as well!
Thanks,
Dave