Hy,

i'am using Plesk 10.4.4 on Debian 6. I wonder how i can configure a Backup to run after 00:00 Clock.
If i enter 01:00, Plesk schedules the Backup for 1:00 PM, but i want to run it at night 1:00 AM.

In the Backup Manager is no setting for AM or PM. If i use 24h settings, example: 13:00 it doses the Backup at
01:00 PM, but how to setup the scheduler to run at 01:00 AM ?

I also looked in to the psa Database in the Table backup_schedule there is no Information about AM or PM, so how does Plesk decide when to run the Backup Job ?

Thanks for for Help

Stefan
 