• Halloween is coming! To celebrate the occasion, we dusted off a couple of old skins, and even created a brand new one (Pixel).
    To get into the festive spirit, install the Skins extension.
  • The new Python extension is now available. It allows customers to deploy and manage WSGI-based Python applications on their websites directly from Plesk.
  • The Plesk Mobile apps for iOS and Android and the Plesk Mobile Center extension have been deprecated, and are no longer available for new installations. In Plesk Obsidian 18.0.84, the Plesk Mobile Center extension will be removed from servers during the upgrade, and the Plesk Mobile apps will lose their server management features.
  • The Social Login extension has been deprecated and will be removed in Plesk Obsidian 18.0.84. After that, it will no longer be possible to log in to Plesk with a Google, Facebook, GitHub account, or with a passkey. Plesk usernames and passwords, as well as logging in with a WebPros Account, are not affected.

Migrating from 8.6 to 11.0.9

djrobo

New Pleskian
Im trying to move from my old provider which is currently using plesk 8.6 to my new provider which is running 11.0.9 using the migration manager.

this is the error:

rsync execution error: Unknown error (255).
Stderr is:
--------------------------------
ssh: connect to host 89.107.56.25 port 22: Connection timed out
rsync: connection unexpectedly closed (0 bytes received so far) [receiver]
rsync error: unexplained error (code 255) at io.c(600) [receiver=3.0.6]


Im guessing this is a timeout issue with my old plesk 8.6 server. I have tried even copying to a cpanel server using cpanels migration tool but i get a similar error to do with time out. I know its not down to the size of any of the accounts im trying to copy as the one im using as a test is 100mb including mail.

any help would be great...

thanks
 
Back
Top