• The APS Catalog has been deprecated and removed from all Plesk Obsidian versions.
    Applications already installed from the APS Catalog will continue working. However, Plesk will no longer provide support for APS applications.
  • Please be aware: with the Plesk Obsidian 18.0.78 release, the support for the ngx_pagespeed.so module will be deprecated and removed from the sw-nginx package.

Moving Server

Jayson

Basic Pleskian
Hello,

I been tasked with moving our Centos 5.7/Plesk 10.4.4 server to a new facility with new ip addresses. I thought this would be a good time to move to VMware and after some post P2V lvm boot problems things appear to be working nicely. I used reconfigurator.pl to change ip addresses and am ready to bring the VM copy live however I want to make sure I don't lose any changes, new email etc. I have altered the soa ttl in preparation but before cut over I would like to run rsync.

If I shutdown email and prevent any logins can I just run

rsync -avz /var/qmail/mailnames/ [email protected]:/var/qmail/mailnames/ to ensure the old (local) and new (remote) mail directories are synced.

I would also sync
/var/www/vhosts//var/lib/mysql/var/lib/pgsql/usr/local/psa

Anyone know if this will work and if there any other directories I should be getting?

Thank you,
 
Back
Top