• Debian 11 has reached its end-of-life (vendor EOL date - August 31, 2026). Plesk Obsidian 18.0.81 is the last release to support it.
    If you are running Plesk Obsidian on Debian 11, we recommend you upgrade those servers to Debian 12 using our dist-upgrade tool.
  • We plan to deprecate and remove the support for XML RPC protocol versions earlier than 1.6.9.1 in Plesk Obsidian 18.0.82. We strongly recommend that you update all existing integrations using earlier versions of the XML RPC protocol to comply with the version 1.6.9.1 specification.

Parallels Panel pre-upgrade check 12.0.x to 12.5.x fails

stevemartin

Basic Pleskian
how can i fix this error iam not able to update 12.0.x to 12.5.x

8DRFpxx.png
 
Comment on this parameter in your main.cf times and try dan Moch once. Another suggestion would be to change temporarily to qmail, uninstall Postfix, Postfix install then re. Switch back to Postfix. So you should also obtain a clean main.cf. I hope I could help you.
 