• Debian 11 is approaching its end-of-life (vendor EOL date - August 31, 2026). Plesk Obsidian 18.0.80 will be the last release to support it.
    If you are running Plesk Obsidian on Debian 11, we recommend you upgrade those servers to Debian 12 using our dist-upgrade tool.
  • We plan to deprecate and remove the support for XML RPC protocol versions earlier than 1.6.9.1 in Plesk Obsidian 18.0.82. We strongly recommend that you update all existing integrations using earlier versions of the XML RPC protocol to comply with the version 1.6.9.1 specification.

Upgrade from version 8.4 to 9.3

L

lockoom

Guest
I have few questions concerning upgrade from version 8.4 to 9.3
1. Is it possible to upgrade directly from 8.4 to 9.3?
2. Or should I have to go full path 8.4.0 -> 8.6.0 -> 9.0.0 -> 9.0.1 -> 9.2.1 -> 9.2.2 -> 9.2.3 -> 9.3.0?
3. Maybe I could skip some steps?
4. What is a preferred method of doing upgrade? Is updating via Plesk web panel (Plesk Control Panel Updater) reliable?

I'm pretty scared of bad things that could happen :)
 
Just run /usr/local/psa/admin/sbin/autoinstaller and follow to instruction. You can upgrade it directly to 9.3.
 
Back
Top