• Our team is looking to connect with folks who use email services provided by Plesk, or a premium service. If you'd like to be part of the discovery process and share your experiences, we invite you to complete this short screening survey. If your responses match the persona we are looking for, you'll receive a link to schedule a call at your convenience. We look forward to hearing from you!
  • We are looking for U.S.-based freelancer or agency working with SEO or WordPress for a quick 30-min interviews to gather feedback on XOVI, a successful German SEO tool we’re looking to launch in the U.S.
    If you qualify and participate, you’ll receive a $30 Amazon gift card as a thank-you. Please apply here. Thanks for helping shape a better SEO product for agencies!
  • The BIND DNS server has already been deprecated and removed from Plesk for Windows.
    If a Plesk for Windows server is still using BIND, the upgrade to Plesk Obsidian 18.0.70 will be unavailable until the administrator switches the DNS server to Microsoft DNS. We strongly recommend transitioning to Microsoft DNS within the next 6 weeks, before the Plesk 18.0.70 release.
  • The Horde component is removed from Plesk Installer. We recommend switching to another webmail software supported in Plesk.

Hosting subscription expiry date

I have a general hosting package service plan that has its validity set to 1 year. Basically, I transfered a handful of clients' hosting onto a Plesk VPS part-way through their yearly term.

These hosting packages need a custom renewal date, which I can setup through the customize subscription page. However, when doing this the subscriptions are locked for syncing. When unlocking and re-syncing, the renewal date reverts to 1 year from the subscription setup date. BTW, I am not using Business Manager as this is not installed on the VPS.

In Plesk 10, I was able to change the renewal date without locking the subscription for syncing.

Is this something that I can no longer do with Plesk 11? If so, is there a way of changing the subscription setup date in the psa database so the renewal date can be changed that way?

Hope my problem makes sense! If not, please ask, any help much appreciated!

Dave

Anyone know if this has been fixed in the latest V 11.5?
 
Back
Top