• Our team is looking to connect with folks who use email services provided by Plesk, or a premium service. If you'd like to be part of the discovery process and share your experiences, we invite you to complete this short screening survey. If your responses match the persona we are looking for, you'll receive a link to schedule a call at your convenience. We look forward to hearing from you!
  • We are looking for U.S.-based freelancer or agency working with SEO or WordPress for a quick 30-min interviews to gather feedback on XOVI, a successful German SEO tool we’re looking to launch in the U.S.
    If you qualify and participate, you’ll receive a $30 Amazon gift card as a thank-you. Please apply here. Thanks for helping shape a better SEO product for agencies!
  • The BIND DNS server has already been deprecated and removed from Plesk for Windows.
    If a Plesk for Windows server is still using BIND, the upgrade to Plesk Obsidian 18.0.70 will be unavailable until the administrator switches the DNS server to Microsoft DNS. We strongly recommend transitioning to Microsoft DNS within the next 6 weeks, before the Plesk 18.0.70 release.
  • The Horde component is removed from Plesk Installer. We recommend switching to another webmail software supported in Plesk.

Question Migrate from PPA 11.5 to Onyx

dsgnr

New Pleskian
Hi everyone. First post here and after some advise. I work for an IT company as their hosting engineer. They have a PPA 11.5 multi server setup and I would like to migrate them to a new version of Plesk.

Here is there setup:

Node 1 - MGMT, DNS
Node 2 - HTTP, DB
Node 3 - Emails
3 name servers (1 primary, 2 slaves)

I have noticed that the new version of Plesk does not allow for us to split our set up like this (PLEASE correct me if I'm wrong).

I have thought that maybe the best way to do this is to use the multi server extension for Plesk and adopt the following setup:

Node 1 - MGMT
Node 2 - HTTP, DB, Emails, DNS
Node 3 - HTTP, DB, Emails, DNS
Node 4 - HTTP, DB, Emails, DNS
Two slave Nameservers

To be honest, I don't want to do this, I'd prefer to have a central email server which will save me heaps of time when it comes to migration and future clients.

Basically, is there a way to keep our existing setup? and is there a migration tool available to migrate from PPA 11.5 to Onyx? We have about 1200 customers, each normally has a few sites on.

Thanks in advance
 
Back
Top