• The APS Catalog has been deprecated and removed from all Plesk Obsidian versions.
    Applications already installed from the APS Catalog will continue working. However, Plesk will no longer provide support for APS applications.
  • Please be aware: with the Plesk Obsidian 18.0.78 release, the support for the ngx_pagespeed.so module will be deprecated and removed from the sw-nginx package.

Migration from 8.6

R

RonaldF

Guest
I'm trying to migrate clients from 8.6 to 9.2.2.

When using the Migration Manager I receive the following message

launchpad error (Error code = 2):
== STDERR ====================
Invalid handle passed
==============================

so I tried to do this by backup and restore.

I created a backup on the 8.6 server, transferred it to the 9.2.2 server and converted it.
I created a new client with the same credentials.
In the backup menu I chose the converted backup, selected the appropriate options and started it.

But I only receive a connection timeout/abort (not a plesk message but a simple browser message)

Any help?
 
Back
Top