Migration manager / syncronize never stop

lvalics

Silver Pleskian
Plesk Guru
I have running into a really strange situation, I tried all but I cannot fix it.
I have pushed in Migration manager the syncronize button and now since then (a few days) I cannot stop it.

Synchronizing and downloading migration agents ... all the time

I have tried several scenario like

- uninstall from RPM the migration manager (as soon as I reinstall, start this issue again
- delete all logs from /usr/local/psa/PMM/logs/
- delete all mifrations from same place /usr/local/psa/PMM/var/
- looking into PSA database to see where it keep the migration tasks (also in /usr/local/psa/PMM/task)
- restart system
- start again syncronize, seems stop it, but when I hit migration manager again, start again.

I going to goes crazy, I need to migrate some domains and I am stucked.
Anyone ???
 
OK, I find it out, in PSA database, longtasks table. Here it was stucked 4 jobs. I deleted and worked again.
 
Hi,

I have same problem but in windows server envirenment! what should i do? how can i see long tasks table? and edit it?
 