• Debian 11 is approaching its end-of-life (vendor EOL date - August 31, 2026). Plesk Obsidian 18.0.80 will be the last release to support it.
    If you are running Plesk Obsidian on Debian 11, we recommend you upgrade those servers to Debian 12 using our dist-upgrade tool.
  • We plan to deprecate and remove the support for XML RPC protocol versions earlier than 1.6.9.1 in Plesk Obsidian 18.0.82. We strongly recommend that you update all existing integrations using earlier versions of the XML RPC protocol to comply with the version 1.6.9.1 specification.

Plesk GUI backup task scheduler update in psa to add additional tasks

WinP

Basic Pleskian
Hi

has anyone made changes to PSA database for Plesk GUI backup task. I want to add two more task to Plesk Backup which runs through GUI though its configured to run from Windows task scheduler.

I can do this by back end by making changes in task scheduler which get removed, when ever there are changes through GUI interface in Backup of Plesk.

Further I have to change task should be "Configured For:" under General Tab i.e. botton right with Windows 2012 r2 as multiple tasks don't run under windows 2000 or XP. Plesk create in old format which allows only single task.

It would be great if these change can be done as I want to add robocopy of full repository to remote server when local backup completes. could not trap from event ID as it has session ID which differs everytime.

any other suggestions are also welcome.

Thanks in advance.

WinP
 
Back
Top