• If you are still using CentOS 7.9, it's time to convert to Alma 8 with the free centos2alma tool by Plesk or Plesk Migrator. Please let us know your experiences or concerns in this thread:
    CentOS2Alma discussion
  • Inviting everyone to the UX test of a new security feature in the WP Toolkit
    For WordPress site owners, threats posed by hackers are ever-present. Because of this, we are developing a new security feature for the WP Toolkit. If the topic of WordPress website security is relevant to you, we would be grateful if you could share your experience and help us test the usability of this feature. We invite you to join us for a 1-hour online session via Google Meet. Select a convenient meeting time with our friendly UX staff here.

Plesk GUI backup task scheduler update in psa to add additional tasks

WinP

Basic Pleskian
Hi

has anyone made changes to PSA database for Plesk GUI backup task. I want to add two more task to Plesk Backup which runs through GUI though its configured to run from Windows task scheduler.

I can do this by back end by making changes in task scheduler which get removed, when ever there are changes through GUI interface in Backup of Plesk.

Further I have to change task should be "Configured For:" under General Tab i.e. botton right with Windows 2012 r2 as multiple tasks don't run under windows 2000 or XP. Plesk create in old format which allows only single task.

It would be great if these change can be done as I want to add robocopy of full repository to remote server when local backup completes. could not trap from event ID as it has session ID which differs everytime.

any other suggestions are also welcome.

Thanks in advance.

WinP
 
Back
Top