Scheduler Error Unable to connect to pipe <\\.\pipe\PSA_pipe>

A

AtulA

Guest
Hi to all,

I am using Plesk Control Panel 9.2 for windows and i have installed it on windows server 2008. While running schedule task basically that a .php file sometimes it give me the error which is mention below

Started: Wed Jun 16 00:00:00 2010
Failed with error: Unable to connect to pipe <\\.\pipe\PSA_pipe> {110D2F0F-F073-4021-AB73-C7886FB9BD1E}Wed Jun 16 00:00:00 2010

and when i run them manually by clicking run now it runs perfectly. sometimes it give same error. i have schedule five job it give error in two or three simultaneously.
plz help me out in this matter.

is there any setting that i can do plz tll me.
thanks in advance.
 
Hi,

Can anyone help? I've started getting exactly the same error on a scheduled task that always ran perfectly before.

Cheers, Martin
 