• Debian 11 is approaching its end-of-life (vendor EOL date - August 31, 2026). Plesk Obsidian 18.0.80 will be the last release to support it.
    If you are running Plesk Obsidian on Debian 11, we recommend you upgrade those servers to Debian 12 using our dist-upgrade tool.
  • We plan to deprecate and remove the support for XML RPC protocol versions earlier than 1.6.9.1 in Plesk Obsidian 18.0.82. We strongly recommend that you update all existing integrations using earlier versions of the XML RPC protocol to comply with the version 1.6.9.1 specification.

update failed: 11.0.9 #51 to 11.0.9 #53

EricVis

Basic Pleskian
I noticed in my Plesk that 11.5.29 is available but since you have some major issues with 11.0 to 11.5 migration I decided to update only MU form 51 to 53 but got error

Execution failed.
Command: autoinstaller
Arguments: Array
(
[0] => --select-product-id
[1] => plesk
[2] => --select-release-current
[3] => --upgrade-installed-components
)

Details: Doing restart of Parallels Installer...

BUSY: Update operation was locked by another update process.



Why?
 
reboot seems a bit too harsh for production server.. any service that can be restarted? or killed?
must be some sort of process that can be killed?

thanks
 
Waiting for 30 minutes should be sufficient in most cases - installer process will exit after this timeout.

Parallels Installer process usually has "installer" in its name.
 
Back
Top