• Debian 11 is approaching its end-of-life (vendor EOL date - August 31, 2026). Plesk Obsidian 18.0.80 will be the last release to support it.
    If you are running Plesk Obsidian on Debian 11, we recommend you upgrade those servers to Debian 12 using our dist-upgrade tool.
  • We plan to deprecate and remove the support for XML RPC protocol versions earlier than 1.6.9.1 in Plesk Obsidian 18.0.82. We strongly recommend that you update all existing integrations using earlier versions of the XML RPC protocol to comply with the version 1.6.9.1 specification.

Question Assistance Required to Configure IIS Resource Limits in Windows Plesk

Thomas Oryon

Regular Pleskian
Server operating system version
Windows server 2022
Plesk version and microupdate number
18.0.79
Hello Support,

We would like to configure the following resource limits for subscriptions hosted on our Windows Plesk server:
  • Concurrent Connections / IIS Limit
  • Application Pool Memory Limit
  • Application Pool CPU Limit
  • Maximum Worker Processes for IIS Application Pool
Could you advise how we can achieve this from Plesk for Windows? We are looking to apply different limits based on hosting plan levels, refer to the attached

Please confirm whether these limits can be managed directly through Plesk service plans/add-ons, or if they need to be configured manually in IIS/application pool settings.
 

Attachments

  • Screenshot 2026-06-23 2021261.png
    Screenshot 2026-06-23 2021261.png
    28.8 KB · Views: 3
Back
Top