• Hi, Pleskians! We are running a UX testing of our upcoming product intended for server management and monitoring.
    We would like to invite you to have a call with us and have some fun checking our prototype. The agenda is pretty simple - we bring new design and some scenarios that you need to walk through and succeed. We will be watching and taking insights for further development of the design.
    If you would like to participate, please use this link to book a meeting. We will sent the link to the clickable prototype at the meeting.
  • Our team is looking to connect with folks who use email services provided by Plesk, or a premium service. If you'd like to be part of the discovery process and share your experiences, we invite you to complete this short screening survey. If your responses match the persona we are looking for, you'll receive a link to schedule a call at your convenience. We look forward to hearing from you!
  • The Horde webmail has been deprecated. Its complete removal is scheduled for April 2025. For details and recommended actions, see the Feature and Deprecation Plan.

Backup task finished alert every 30 minutes

X

xmuskrat

Guest
For three days now, I'm getting alerts every 30 minutes.

--

Backup task finished.

Task was created by with guid (f2f76e8b-fe3a-4f02-ad30-59385e79950d)

Creation date is: 2010-Nov-21 16:35:01

--

My backup is stalled. There is no way in the control panel to abort the stalled backup.
 
Is there a way for me to cancel an in-process backup that's stuck?
 
It has happened to me twice.
Logged in as root in SSH and typed 'top ic' command.
The stuck process shows almost inmediately usually with hundreds of minutes in time process.
From there type the PID number to kill the process or if you prefer type 'kill -9' followed by the PID number.

good luck
 
I am also facing same issue. I am getting mail reminder about backup fail status, but i am using windows plesk 9.5.2 version. How to disable this.

regards
steve
 
Back
Top