• Debian 11 has reached its end-of-life (vendor EOL date - August 31, 2026). Plesk Obsidian 18.0.81 is the last release to support it.
    If you are running Plesk Obsidian on Debian 11, we recommend you upgrade those servers to Debian 12 using our dist-upgrade tool.
  • We plan to deprecate and remove the support for XML RPC protocol versions earlier than 1.6.9.1 in Plesk Obsidian 18.0.82. We strongly recommend that you update all existing integrations using earlier versions of the XML RPC protocol to comply with the version 1.6.9.1 specification.

Backup task finished alert every 30 minutes

X

xmuskrat

Guest
For three days now, I'm getting alerts every 30 minutes.

--

Backup task finished.

Task was created by with guid (f2f76e8b-fe3a-4f02-ad30-59385e79950d)

Creation date is: 2010-Nov-21 16:35:01

--

My backup is stalled. There is no way in the control panel to abort the stalled backup.
 
Is there a way for me to cancel an in-process backup that's stuck?
 
It has happened to me twice.
Logged in as root in SSH and typed 'top ic' command.
The stuck process shows almost inmediately usually with hundreds of minutes in time process.
From there type the PID number to kill the process or if you prefer type 'kill -9' followed by the PID number.

good luck
 
I am also facing same issue. I am getting mail reminder about backup fail status, but i am using windows plesk 9.5.2 version. How to disable this.

regards
steve
 
Back
Top