• Introducing WebPros Cloud - a fully managed infrastructure platform purpose-built to simplify the deployment of WebPros products !  WebPros Cloud enables you to easily deliver WebPros solutions — without the complexity of managing the infrastructure.
    Join the pilot program today!
  • The Horde component is removed from Plesk Installer. We recommend switching to another webmail software supported in Plesk.
  • The BIND DNS server has already been deprecated and removed from Plesk for Windows.
    If a Plesk for Windows server is still using BIND, the upgrade to Plesk Obsidian 18.0.70 will be unavailable until the administrator switches the DNS server to Microsoft DNS. We strongly recommend transitioning to Microsoft DNS within the next 6 weeks, before the Plesk 18.0.70 release.

Migration to both 2003 and 2008 with newest PMM

T

TheProblemxx

Guest
I´m trying to migrate from a 2003->>2008 and some of the accounts/domains migrate just fine, but a lot of times it just migrates the client account and then it stops and says that it was 'successfully' migrated although domains weren´t migrated to the clients account...

Trying to then do a migration of the domain alone to the migrated clientaccount ends the same way - it shows as if it was a success but nothing happened at all...

Just for tests same account has been tried migrated to a new 2003 server, but same result, so it isn´t 2008 specific.

Some accounts doesn´t evrn turn up in IIS although it says 'successful transfer' and after that they seem to get locked somehow.

Migration has been tested on both 2003->2003 and 2003->2008 - same result with same accounts - the accounts work fine on the server they are to be migrated from...

A ticket has been opened at Parallels but nobody has answered it for several days....


Anybody outthere with a brilliant idea to what´s going on?
 
Back
Top