• Debian 11 has reached its end-of-life (vendor EOL date - August 31, 2026). Plesk Obsidian 18.0.81 is the last release to support it.
    If you are running Plesk Obsidian on Debian 11, we recommend you upgrade those servers to Debian 12 using our dist-upgrade tool.
  • We plan to deprecate and remove the support for XML RPC protocol versions earlier than 1.6.9.1 in Plesk Obsidian 18.0.82. We strongly recommend that you update all existing integrations using earlier versions of the XML RPC protocol to comply with the version 1.6.9.1 specification.

Change domain/Workspace expiration date

José_Seixas

New Pleskian
Hi,

The message associated to the domain is:

"Warning: The webspace was suspended. All sites hosted with the webspace are not available."

I know that on the past versions the expiration date is changed in the subscrition details.

This is Plesk 12.08 Webadmin Edition and theres no possibility to change by the "interface management" on service provider view.

How is it possible to change workspace expiration dates?

Thanks in advance.

José Seixas
 
Yes, "Web Admin" license is designed for personal use, thus service provider view is not available there.
Did you change license or moved account from another server?
Generally higher level license is advised if service provider view is required.
 
I´ve made an upgrade from 11.5 to Plesk 12. It must be a way to change the expiredate of the domain.
Maybe directly on psa DB.

Any help please?
Thanks.
 
Thank you IgorG for your feedback.
I´ve tried "./subscription_settings -u example.com -expiration -1" (unlimited) with no results.
I think this is associated to the wrokspace and to the domain.
 
Back
Top