C
cVarz
Guest
Well I reluctantly upgraded to 7.0 and Server 2003. So far after a week of running the new OS and CP, I have not had a single problem.
The CPU usage is not a problem for me as my entire server is only at 11%.
Here is what is on it.
58 Voice servers, Plesk w / 17 clients.
I have to say I am impressed at this point although, I should not have had to upgrade and foot the bill for the $800.00 OS + install.
Server 2003, dual Xeon 3.06 CPU's, 3GIGS of DDR ECC, and 2x 80 GIG IDE HD's.
The CPU usage is not a problem for me as my entire server is only at 11%.
Here is what is on it.
58 Voice servers, Plesk w / 17 clients.
I have to say I am impressed at this point although, I should not have had to upgrade and foot the bill for the $800.00 OS + install.
Server 2003, dual Xeon 3.06 CPU's, 3GIGS of DDR ECC, and 2x 80 GIG IDE HD's.