• Inviting everyone who uses WordPress management tools in Plesk
    The Plesk team is conducting a 60-minute research session that includes an interview and a moderated usability test.
    To participate, please use this link .
    Your experience will help shape product decisions and ensure the tools better support real-world use cases.

Migration from one Plesk 12 to another Plesk 12

Status
Not open for further replies.

brett12

New Pleskian
Servers are both with the same provider. New server was just built--clean install.

Start the migration and transfer and the largest bulk of errors I have is:

"Failed deployment of Mail User [email protected]"

Internal server error: mailmng-core failed: mailmng[19699]: Can't read encryption key from '/var/lib/plesk/mail/auth/passwd_db_key': No such file or directory (2)
mailmng[19699]: Failed to initialize encryption cipher 'AES-256-CBC:pKCS' with key '/var/lib/plesk/mail/auth/passwd_db_key'
mailmng[19699]: Failed to initialize password cipher context (for mail address '[email protected]')
unable to set password
System error 2: No such file or directory


passwad_db_key and the folder structure exists on both the old and new server, how can I fix these errors and continue the migration? Both servers are at Parallels Plesk v12.0.18_build1200140606.15


Thanks!
 
Status
Not open for further replies.
Back
Top