• The new Python extension is now available. It allows customers to deploy and manage WSGI-based Python applications on their websites directly from Plesk.
  • Debian 11 has reached its end-of-life (vendor EOL date - August 31, 2026). Plesk Obsidian 18.0.81 is the last release to support it.
    If you are running Plesk Obsidian on Debian 11, we recommend you upgrade those servers to Debian 12 using our dist-upgrade tool.
  • We plan to deprecate and remove the support for XML RPC protocol versions earlier than 1.6.9.1 in Plesk Obsidian 18.0.82. We strongly recommend that you update all existing integrations using earlier versions of the XML RPC protocol to comply with the version 1.6.9.1 specification.

Plesk Migration Manager - Froze

C

c1markp

Guest
After 10 hours and transfering 6.85 GB of data my Plesk Migration Manager has frozen. scp is no longer active on the host I'm migrating from. I have 249 MB with 107 files left to go. Anyone know how I can get this to cleanly resume? I'm going to go fill out a support ticket too.

This is going from a Plesk 6.0/RH9 server to a Plesk 7.5.3 Reloaded/FC1 server.
 
I'd recommend upgrading the Plesk 6 box to Plesk 7.0.4, 7.1.7, then 7.5.3 then running psadump/psarestore to perform the migration as it tends to be more reliable for large migrations in my experience.
 
Did psadump/psarestore change from 6.0 to 7.1.7? Why wouldn't you suggest using the backup utilities from 6.0?
 
PMM is the ONLY method of going directly from 6.0 -> 7.5. If you want to use psadump/psarestore (which I'd recommend) you need to upgrade to the same release of psadump/psarestore on both source and destination server. In your case, I'd suggest upgrading your Plesk 6 server to 7.0, 7.1 then 7.5.3 and perform psadump/psarestore.
 
So what about possibly breaking the current live server with the upgrade process? Is there a high chance of that? I'm sure there is always a chance. Also, I'm sure this gets into some licensing issues since I plan to migrate away from the server I don't want to buy a Reloaded license for it...
 
Originally posted by c1markp
After 10 hours and transfering 6.85 GB of data my Plesk Migration Manager has frozen. scp is no longer active on the host I'm migrating from. I have 249 MB with 107 files left to go. Anyone know how I can get this to cleanly resume?

You may copy content files from your source host using any available method to the /usr/local/psa/PMM/archives directory and then re-run migration in "Import mode" as described in documentation.
 
Back
Top